Entrance to children's discovery area.
First water fountain installed in the building.
Christmas in June? Some of the evergreens to be planted on the property soon.
Preparations to pour concrete pads for column surrounds.
Concrete pads for column surrounds (6' in diameter!).
Preparing the nature trail for paving.
Rock facade on the warehouse wall.