Warehouse area floor has been prepared for the concrete floor slab to be poured.
Preparation has begun for the concrete floor slabs to be put into the warehouse and workshop areas.
New concrete floor slab in warehouse area.
The concrete floor of the warehouse area was poured today.
South side of museum floor being prepared for concrete slab pour.
Preparations for the pouring of the south museum concrete floor slab continue.
Preparations for the pouring of the south museum concrete floor slab continue.
South museum concrete floor slab being poured.
South museum floor slab has been completed.
North museum floor has been prepared for concrete slab to be poured.
North museum concrete floor slab was poured on 16 July 2003.
The warehouse truck dock area has been prepared for concrete to be poured.
The truck dock area concrete is now complete.
Interior of museum and workshop from the southwest corner.
Overall view from the west above the car parking lot.